Over the past 15 years, Chappell Central has worked with a great team of architects, engineers, and contractors to become proficient in HVAC installations in water and waste water treatment plants. The next time you take a sip of tap water or flush the toilet, there is a good chance that Chappell Central had something to do with it. Here are some of the most recent projects:
Montevideo Wastewater Treatment Plant
This wastewater treatment plan is just down the highway from our headquarters in Willmar, MN. Chappell Central worked under Rice Lake Contracting who teamed up with a familiar group of consulting engineers Bolten and Menk, design engineer Wentz and Asc., and architects Short, Ellingson and Hendrickson.
St. Peter Water Treatment Plant
Chappell Central did the St. Peter wastewater plant a few years ago and are back to do the water treatment plant. This plant is part of an $18,000,000 water system improvement project for the City of St. Peter and is expected to be up and running in March 2012. Again Chappell Central, Rice Lake Contracting, Wentz and Asc., and Bolten and Menk were on the construction team.
Watertown Wastewater Treatment Plan
For this facility, we went to South Dakota. Gridor Construction was the general contractor with SECOM taking care of the Architecture and Engineering. Unlike the commercial school projects we have where you are behind the day you get the contract, these industrial projects have much more elongated schedules. It is nice to have a bit of time to get thru all the necessary construction document procedures.
Grand Rapids Wastewater Treatment Plant
This project was completed during the Fall of 2011 under the direction of CH2M Architects, AE2S Engineers and Rice Lake Construction. For HVAC, the project had 20 exhaust fans, 50 electric heaters, heat pumps, 3 large makeup air units and a VAV duct system.
Do you have a large commercial HVAC Project that you need a bid on? Contact Chappell Central at 320-235-2151 or fill out this simple form on our website.